<?xml version="1.0" encoding="UTF-8" ?>
<rss version="2.0" 
  xmlns:itunes="http://www.itunes.com/dtds/podcast-1.0.dtd"
  xmlns:atom="http://www.w3.org/2005/Atom" 
  xmlns:content="http://purl.org/rss/1.0/modules/content/"
  xmlns:media="http://search.yahoo.com/mrss/"
>
  <channel>
    <title>Construction | EurobuildCEE</title>
    <link>https://eurobuildcee.com/en/news/construction/</link>
    <description><![CDATA[]]></description>
    
    <itunes:author>EurobuildCEE</itunes:author>
    <itunes:owner>
      <itunes:email>editorial@eurobuildcee.com</itunes:email>
    </itunes:owner>
    
    <atom:link href="https://eurobuildcee.com/en/news/construction/rss" rel="self" type="application/rss+xml" />
    <language>en</language>
    <lastBuildDate>Sun, 01 Nov 2026 19:06:04 UTC</lastBuildDate>
	
        <item>
      <title><![CDATA[Strabag to Build 170-Metre Roma Tower in Warsaw]]></title>
      <link>https://eurobuildcee.com/en/news/37372-strabag-to-build-170-metre-roma-tower-in-warsaw</link>
	    <guid isPermaLink="false">3d910ef9becd86edb2d3be8ca8dfa1fc</guid>
	    <category>Construction</category>
      <description><![CDATA[Strabag, together with TKT Engineering, has been appointed general contractor for Roma Tower, a 170-metre residential skyscraper planned for central Warsaw. The EUR 200 mln project will comprise 357 luxury apartments, with construction scheduled to take 50 months.]]></description>
      <pubDate>Thu, 22 Oct 2026 0:00:00 T</pubDate> 
    </item>
        <item>
      <title><![CDATA[PORR wins PLN 539 mln contract for US air force base in Wrocław]]></title>
      <link>https://eurobuildcee.com/en/news/37344-porr-wins-pln-539-mln-contract-for-us-air-force-base-in-wroclaw</link>
	    <guid isPermaLink="false">abe26c6ace59013c7c366a84290c2aac</guid>
	    <category>Construction</category>
      <description><![CDATA[PORR has signed a contract worth around PLN 539 mln gross to build the first phase of a cargo and logistics facility for the US Air Force at Wrocław-Strachowice Airport. Commissioned by the Regional Infrastructure Management Board in Wrocław, the project is scheduled for completion by 2029.]]></description>
      <pubDate>Fri, 16 Oct 2026 0:00:00 T</pubDate> 
    </item>
        <item>
      <title><![CDATA[BERGER Bau to Modernise Wrocław Student Residences]]></title>
      <link>https://eurobuildcee.com/en/news/37319-berger-bau-to-modernise-wroclaw-student-residences</link>
	    <guid isPermaLink="false">95a4c08b069b1c01250ffeda1f8e7f7b</guid>
	    <category>Construction</category>
      <description><![CDATA[BERGER Bau Polska will modernise the Kredka and Ołówek student residences owned by the University of Wrocław under a contract worth PLN 41.44 mln gross. Work will bring the buildings into compliance with current fire safety regulations and is scheduled to run from October 2026 to April 2029.]]></description>
      <pubDate>Tue, 13 Oct 2026 0:00:00 T</pubDate> 
    </item>
        <item>
      <title><![CDATA[Dekpol Budownictwo strengthens its position in the public-sector construction market]]></title>
      <link>https://eurobuildcee.com/en/news/37289-dekpol-budownictwo-strengthens-its-position-in-the-public-sector-construction-market</link>
	    <guid isPermaLink="false">ad5dae030351324d7b709be52a633081</guid>
	    <category>Construction</category>
      <description><![CDATA[Public-sector construction has become one of the fastest-growing areas of Dekpol Budownictwo’s business. Over the past two years, the company has signed general contracting agreements for projects spanning culture, education, sport, public safety and social policy, with a combined value exceeding PLN 1 billion. Its portfolio includes projects across Poland as well as the construction of the new Polish Antarctic Station on King George Island.]]></description>
      <pubDate>Thu, 08 Oct 2026 0:00:00 T</pubDate> 
    </item>
        <item>
      <title><![CDATA[Topping-out ceremony held at new primary school in Biedrusko]]></title>
      <link>https://eurobuildcee.com/en/news/37288-topping-out-ceremony-held-at-new-primary-school-in-biedrusko</link>
	    <guid isPermaLink="false">2b7f3676262f189cbb4e3454f6330155</guid>
	    <category>Construction</category>
      <description><![CDATA[A traditional topping-out ceremony has been held at the construction site of the new primary school in Biedrusko. The project on Chludowska Street, being developed by Dekpol Budownictwo, has reached another key milestone. According to Suchy Las municipality, it is the largest educational investment in its history. The new school will accommodate up to 600 pupils.]]></description>
      <pubDate>Thu, 08 Oct 2026 0:00:00 T</pubDate> 
    </item>
        <item>
      <title><![CDATA[Mirbud wins PLN 168 mln contract for Warsaw sports hall]]></title>
      <link>https://eurobuildcee.com/en/news/37220-mirbud-wins-pln-168-mln-contract-for-warsaw-sports-hall</link>
	    <guid isPermaLink="false">b47b84be1e32ada197b34168a7c88052</guid>
	    <category>Construction</category>
      <description><![CDATA[Mirbud has signed a contract with Warsaw University of Technology to build a sports and events hall next to the Syrenka Stadium in Warsaw. The design-and-build contract is worth more than PLN 168 mln.]]></description>
      <pubDate>Fri, 25 Sep 2026 0:00:00 T</pubDate> 
    </item>
        <item>
      <title><![CDATA[Budimex to build archive for Adam Mickiewicz University]]></title>
      <link>https://eurobuildcee.com/en/news/37205-budimex-to-build-archive-for-adam-mickiewicz-university</link>
	    <guid isPermaLink="false">428412187c14a062fb1f627001a38790</guid>
	    <category>Construction</category>
      <description><![CDATA[Budimex has signed a contract with Adam Mickiewicz University in Poznań to design and build a new university archive. The contract is worth more than PLN 26.4 million net, with the project scheduled for completion within 18 months.]]></description>
      <pubDate>Wed, 23 Sep 2026 0:00:00 T</pubDate> 
    </item>
        <item>
      <title><![CDATA[Budimex to rebuild the  I/43 Road]]></title>
      <link>https://eurobuildcee.com/en/news/37183-budimex-to-rebuild-the-i43-road</link>
	    <guid isPermaLink="false">d71b5bc5076243ac22b8e30d988b67ae</guid>
	    <category>Construction</category>
      <description><![CDATA[Budimex has begun reconstructing a more than 2-kilometre section of the I/43 road near Černá Hora in the Czech Republic. The CZK 250.2 mln contract (EUR 10.3 mln) covers the construction of a new road and two bridges.]]></description>
      <pubDate>Mon, 21 Sep 2026 0:00:00 T</pubDate> 
    </item>
        <item>
      <title><![CDATA[Budimex to complete Bydgoszcz hospital expansion]]></title>
      <link>https://eurobuildcee.com/en/news/37180-budimex-to-complete-bydgoszcz-hospital-expansion</link>
	    <guid isPermaLink="false">9407be1bd4c5f4d01dd9b1a971290160</guid>
	    <category>Construction</category>
      <description><![CDATA[Budimex will complete the expansion of Dr Jan Biziel University Hospital No. 2 in Bydgoszcz. The contract is worth nearly PLN 211 mln gross.]]></description>
      <pubDate>Fri, 18 Sep 2026 0:00:00 T</pubDate> 
    </item>
        <item>
      <title><![CDATA[Berger Bau to modernise Wrocław police headquarters]]></title>
      <link>https://eurobuildcee.com/en/news/37177-berger-bau-to-modernise-wroclaw-police-headquarters</link>
	    <guid isPermaLink="false">3227549fc4d7b0b942317fd2f640160d</guid>
	    <category>Construction</category>
      <description><![CDATA[Berger Bau has signed a contract to modernise the Lower Silesian Police headquarters in Wrocław. The PLN 24 mln project is scheduled for completion within 28 months.]]></description>
      <pubDate>Fri, 18 Sep 2026 0:00:00 T</pubDate> 
    </item>
        <item>
      <title><![CDATA[Polish construction sector faces growing labour shortage ]]></title>
      <link>https://eurobuildcee.com/en/news/37085-polish-construction-sector-faces-growing-labour-shortage</link>
	    <guid isPermaLink="false">caff288f3dbd050e5c0e76097e333ff9</guid>
	    <category>Construction</category>
      <description><![CDATA[Poland’s construction sector is facing increasing labour shortages, with the industry short of around 150,000 workers. Turnover among engineers has reached 42 pct, according to Randstad’s latest report, 'Labour Market in the Construction Sector: Trends, Challenges and Recruitment Strategies for 2026'. Demographic changes, rising employee expectations and the sector’s shift towards Construction 4.0 are adding to the pressure.]]></description>
      <pubDate>Tue, 01 Sep 2026 0:00:00 T</pubDate> 
    </item>
        <item>
      <title><![CDATA[Carbon Counts in Construction]]></title>
      <link>https://eurobuildcee.com/en/news/37077-carbon-counts-in-construction</link>
	    <guid isPermaLink="false">892f34aa7ab656adb0cc58dbcbd08d7c</guid>
	    <category>Construction</category>
      <description><![CDATA[Cost remains a decisive factor in construction tenders, but investors are increasingly looking beyond the upfront price. For production facilities and warehouses, factors such as delivery time and technical specifications are now being considered alongside a building’s carbon footprint over its entire life cycle.]]></description>
      <pubDate>Mon, 31 Aug 2026 0:00:00 T</pubDate> 
    </item>
        <item>
      <title><![CDATA[Polish construction sector under pressure ]]></title>
      <link>https://eurobuildcee.com/en/news/37068-polish-construction-sector-under-pressure</link>
	    <guid isPermaLink="false">cf1420a1b265012ab70e3e275f812180</guid>
	    <category>Construction</category>
      <description><![CDATA[Construction material prices are rising significantly more slowly than inflation, with prices in some categories even falling. Despite this, the situation for construction companies remains challenging. The number of corporate insolvencies in the sector rose by 31.3 pct year on year, while the number of restructuring proceedings almost doubled. Weaker demand, high labour costs and pressure on liquidity are among the main challenges facing the industry.]]></description>
      <pubDate>Fri, 28 Aug 2026 0:00:00 T</pubDate> 
    </item>
        <item>
      <title><![CDATA[Polish housing market slows as projects put on hold]]></title>
      <link>https://eurobuildcee.com/en/news/37019-polish-housing-market-slows-as-projects-put-on-hold</link>
	    <guid isPermaLink="false">6afe0837f8aac5e0a2a7fa5161b07b56</guid>
	    <category>Construction</category>
      <description><![CDATA[Poland’s residential construction market is slowing, with 936 projects put on hold over the past year. Yet investors continue to prepare new projects, with activity in planning and design on the rise. According to Kompas Inwestycji, 1,219 projects reached the foundation stage or moved into construction between August 2025 and July 2026.]]></description>
      <pubDate>Thu, 20 Aug 2026 0:00:00 T</pubDate> 
    </item>
        <item>
      <title><![CDATA[Planning Code Set to Change Real Estate Market]]></title>
      <link>https://eurobuildcee.com/en/news/37012-planning-code-set-to-change-real-estate-market</link>
	    <guid isPermaLink="false">e2d9bc580ff07f2c76c307150110f38f</guid>
	    <category>Construction</category>
      <description><![CDATA[The Territorial Planning, Urbanism and Construction Code (CATUC) is expected to have a significant impact on Romania’s real estate market. Two measures are likely to be particularly important: tighter limits on how much can be built on a site and a new infrastructure payment, the cost of which has yet to be determined, according to Crosspoint Real Estate.]]></description>
      <pubDate>Thu, 20 Aug 2026 0:00:00 T</pubDate> 
    </item>
        <item>
      <title><![CDATA[Tunnel boring soon to begin]]></title>
      <link>https://eurobuildcee.com/en/news/36978-tunnel-boring-soon-to-begin</link>
	    <guid isPermaLink="false">4828decbcf77a6591a9264b2e10ee945</guid>
	    <category>Construction</category>
      <description><![CDATA[Work is progressing on the High-Speed Rail (KDP) tunnel in Łódź, part of the Port Polska project. At the launch chamber in Retkinia, the concrete support for the Tunnel Boring Machine (TBM) shield has been completed, while the first components of the machine are being assembled on site. Tunnelling on one of Poland’s most important underground railway projects is due to begin in 2027.]]></description>
      <pubDate>Fri, 14 Aug 2026 0:00:00 T</pubDate> 
    </item>
        <item>
      <title><![CDATA[Budimex begins earthworks on Poland&#039;s first nuclear power plant]]></title>
      <link>https://eurobuildcee.com/en/news/36966-budimex-begins-earthworks-on-polands-first-nuclear-power-plant</link>
	    <guid isPermaLink="false">b2af2b06183911576dad99a15a5d4933</guid>
	    <category>Construction</category>
      <description><![CDATA[The construction of Poland’s first nuclear power plant has reached an important milestone. Bechtel, the project’s general contractor, is taking over management of the construction site from Polskie Elektrownie Jądrowe (PEJ). At the same time, Budimex, one of Poland’s largest construction companies, has begun the earthworks.]]></description>
      <pubDate>Wed, 12 Aug 2026 0:00:00 T</pubDate> 
    </item>
        <item>
      <title><![CDATA[Budimex wins foundational contract for CPK]]></title>
      <link>https://eurobuildcee.com/en/news/36696-budimex-wins-foundational-contract-for-cpk</link>
	    <guid isPermaLink="false">7ddd00ed8d1809f07b426aa9346c5677</guid>
	    <category>Construction</category>
      <description><![CDATA[Budimex has been awarded a PLN 146 mln contract to construct the foundations of the passenger terminal of the new airport that forms part of the massive Port of Poland (or CPK) transport hub, which is being developed between Warsaw and Łódź. ]]></description>
      <pubDate>Tue, 23 Jun 2026 0:00:00 T</pubDate> 
    </item>
        <item>
      <title><![CDATA[Work progresses on Henryk Arctowski Antarctic Station]]></title>
      <link>https://eurobuildcee.com/en/news/36676-work-progresses-on-henryk-arctowski-antarctic-station</link>
	    <guid isPermaLink="false">4d5b81fec9dffc2cebe304301a2f8651</guid>
	    <category>Construction</category>
      <description><![CDATA[A significant stage in the assembly of the new main building of the Henryk Arctowski Antarctic Station has been completed.]]></description>
      <pubDate>Fri, 19 Jun 2026 0:00:00 T</pubDate> 
    </item>
        <item>
      <title><![CDATA[Poland heading for a two-tier market]]></title>
      <link>https://eurobuildcee.com/en/news/36637-poland-heading-for-a-two-tier-market</link>
	    <guid isPermaLink="false">da083fb1c432f79adc778a328be08ee4</guid>
	    <category>Construction</category>
      <description><![CDATA[The value of the 960 largest construction projects in Poland is already more than PLN 1 tln and continues to rise, driven by a wave of infrastructure and energy megaprojects.]]></description>
      <pubDate>Fri, 12 Jun 2026 0:00:00 T</pubDate> 
    </item>
        <item>
      <title><![CDATA[Poland underestimates Building site crime]]></title>
      <link>https://eurobuildcee.com/en/news/36362-poland-underestimates-building-site-crime</link>
	    <guid isPermaLink="false">1201fd573bcffcc092b88142ac6b0457</guid>
	    <category>Construction</category>
      <description><![CDATA[According to the latest BauWatch crime report only 56 pct of building site managers across the EU believe crime to be rising, but in Poland this figure is much lower at only 36 pct.]]></description>
      <pubDate>Tue, 14 Apr 2026 0:00:00 T</pubDate> 
    </item>
        <item>
      <title><![CDATA[Dekpol debuts in Romania with 20,000 sqm logistics park]]></title>
      <link>https://eurobuildcee.com/en/news/35901-dekpol-debuts-in-romania-with-20000-sqm-logistics-park</link>
	    <guid isPermaLink="false">301d01984fa7dce86bab6d4d613b6678</guid>
	    <category>Construction</category>
      <description><![CDATA[Dekpol Budownictwo is eentering Romania. In December 2025, the company signed an agreement with a developer to carry out design work for the first stage of a 20,000 sqm logistics park in Bucharest.]]></description>
      <pubDate>Fri, 16 Jan 2026 0:00:00 T</pubDate> 
    </item>
        <item>
      <title><![CDATA[Construction industry waiting to boom]]></title>
      <link>https://eurobuildcee.com/en/news/35778-construction-industry-waiting-to-boom</link>
	    <guid isPermaLink="false">3b05c9c3cce88159fe7c551d3e49a6df</guid>
	    <category>Construction</category>
      <description><![CDATA[According to the report 'Polish Construction Companies 2025' prepared by Deloitte, the construction industry continues to play a major role in Poland’s GDP. Its overall condition directly influences national infrastructure development and the real estate market.]]></description>
      <pubDate>Wed, 10 Dec 2025 0:00:00 T</pubDate> 
    </item>
        <item>
      <title><![CDATA[Warsaw returns another building to its prime]]></title>
      <link>https://eurobuildcee.com/en/news/35764-warsaw-returns-another-building-to-its-prime</link>
	    <guid isPermaLink="false">6d378c1d7df74d165c6b2ff5e33baa3b</guid>
	    <category>Construction</category>
      <description><![CDATA[The renovation of a townhouse on ul Targowa in Warsaw's Praga district is nearing completion. The work was funded by the housing association with financial support from the city.
]]></description>
      <pubDate>Mon, 08 Dec 2025 0:00:00 T</pubDate> 
    </item>
        <item>
      <title><![CDATA[2025 looks optimistic for the construction companies]]></title>
      <link>https://eurobuildcee.com/en/news/34983-2025-looks-optimistic-for-the-construction-companies</link>
	    <guid isPermaLink="false">afe0cc0beb2b9f988e0c0682bce4c01b</guid>
	    <category>Construction</category>
      <description><![CDATA[According to a report by research company Spectis “Construction companies in Poland 2025-2030”, the total revenues of the 300 leading construction groups in 2023 amounted to PLN 152 bln, which accounted for more than 60 pct of the revenues of the entire sector of medium and large construction companies. 
]]></description>
      <pubDate>Mon, 10 Feb 2025 0:00:00 T</pubDate> 
    </item>
        <item>
      <title><![CDATA[Strabag to build The Arc]]></title>
      <link>https://eurobuildcee.com/en/news/34630-strabag-to-build-the-arc</link>
	    <guid isPermaLink="false">f7d39620fd98ccb30f1c7741fe158210</guid>
	    <category>Construction</category>
      <description><![CDATA[Strabag Romania has been selected by the developer and investor PPF Real Estate as the general contractor for the construction of its new office property, The Arc. The investment will bring a ten-story, class A office building to the 6th District of Bucharest.]]></description>
      <pubDate>Mon, 02 Sep 2024 0:00:00 T</pubDate> 
    </item>
        <item>
      <title><![CDATA[Digitalisation to the rescue]]></title>
      <link>https://eurobuildcee.com/en/news/34378-digitalisation-to-the-rescue</link>
	    <guid isPermaLink="false">17da20e1e103e19f969d54c67d674c71</guid>
	    <category>Construction</category>
      <description><![CDATA[In Berlin Hyp’s most recent Trendbarometer, more than 200 real estate professionals expressed their opinions on opportunities and risks in the real
estate industry at the moment. In addition, the expert survey focused on the effects of megatrends such as demographic developments, digitalisation and urbanisation.]]></description>
      <pubDate>Mon, 06 May 2024 0:00:00 T</pubDate> 
    </item>
        <item>
      <title><![CDATA[There&#039;s hope in the modules]]></title>
      <link>https://eurobuildcee.com/en/news/34070-theres-hope-in-the-modules</link>
	    <guid isPermaLink="false">c45cacd0247d28eb223a75f200d46a57</guid>
	    <category>Construction</category>
      <description><![CDATA[According to the report released by research firm Spectis, “Modular construction market in Poland 2024-2029”, top 100 manufacturers of prefabricated buildings made of wood, steel, concrete, or LECA generated revenue of nearly PLN 10 bln in 2022, with 47 pct of the figure contributed by sales in the modular building segment.]]></description>
      <pubDate>Mon, 08 Jan 2024 0:00:00 T</pubDate> 
    </item>
        <item>
      <title><![CDATA[Erbud and Daewoo sign five-year MOU]]></title>
      <link>https://eurobuildcee.com/en/news/33662-erbud-and-daewoo-sign-five-year-mou</link>
	    <guid isPermaLink="false">9983a45ec612b9372871ef63ee241b31</guid>
	    <category>Construction</category>
      <description><![CDATA[Polish construction company Erbud has signed a cooperation agreement with South Korean giant Daewoo Engineering & Construction to jointly implement projects in the energy and key industrial, infrastructural and military sectors across Poland.]]></description>
      <pubDate>Mon, 17 Jul 2023 0:00:00 T</pubDate> 
    </item>
        <item>
      <title><![CDATA[Russian builders enlisted in return for orders]]></title>
      <link>https://eurobuildcee.com/en/news/33623-russian-builders-enlisted-in-return-for-orders</link>
	    <guid isPermaLink="false">e17d00b154831f31866ad96f6b352596</guid>
	    <category>Construction</category>
      <description><![CDATA[Moscow city authorities have “asked” development and construction companies to enlist their workers to fight in the war in Ukraine in exchange for orders. One of these corporations is to provide the Russian defence ministry with 30 volunteers ready to be posted to the front by the end of August.]]></description>
      <pubDate>Mon, 03 Jul 2023 0:00:00 T</pubDate> 
    </item>
        <item>
      <title><![CDATA[Skanska to build for CD Projekt]]></title>
      <link>https://eurobuildcee.com/en/news/33429-skanska-to-build-for-cd-projekt</link>
	    <guid isPermaLink="false">96614fbb16c685125f0e274b3f6b8d8e</guid>
	    <category>Construction</category>
      <description><![CDATA[Skanska has been commissioned to construct a new building for Polish video game developer CD Projekt on its main campus in Warsaw’s Praga Północ district.]]></description>
      <pubDate>Mon, 17 Apr 2023 0:00:00 T</pubDate> 
    </item>
        <item>
      <title><![CDATA[Training centre in Attendorn]]></title>
      <link>https://eurobuildcee.com/en/news/33288-training-centre-in-attendorn</link>
	    <guid isPermaLink="false">8be9c8f2977bbe85dec249c9c11d8e35</guid>
	    <category>Construction</category>
      <description><![CDATA[Viega has launched an interactive training centre near its headquarters in Attendorn. Over five floors, Viega World occupies a total of 12,000 sqm of space.
]]></description>
      <pubDate>Thu, 02 Mar 2023 0:00:00 T</pubDate> 
    </item>
        <item>
      <title><![CDATA[Frontex opens new HQ tender]]></title>
      <link>https://eurobuildcee.com/en/news/32623-frontex-opens-new-hq-tender</link>
	    <guid isPermaLink="false">587dab0fe0d84d649f235cd521c8b8cc</guid>
	    <category>Construction</category>
      <description><![CDATA[Frontex, the European Border and Coast Guard Agency, has opened a tender to select a contractor for the design-and-build project of its future headquarters in Warsaw.]]></description>
      <pubDate>Tue, 12 Jul 2022 0:00:00 T</pubDate> 
    </item>
        <item>
      <title><![CDATA[Erbud wins PLN 30 mln WUM contract]]></title>
      <link>https://eurobuildcee.com/en/news/32566-erbud-wins-pln-30-mln-wum-contract</link>
	    <guid isPermaLink="false">5cf804803360a972e4d810f6bd181881</guid>
	    <category>Construction</category>
      <description><![CDATA[Erbud has been awarded a PLN 29.8 mln contract to modernise the Rector’s Office of the Medical University of Warsaw (WUM).]]></description>
      <pubDate>Wed, 22 Jun 2022 0:00:00 T</pubDate> 
    </item>
        <item>
      <title><![CDATA[Atlas Ward starts work on Szczecin sheds]]></title>
      <link>https://eurobuildcee.com/en/news/32478-atlas-ward-starts-work-on-szczecin-sheds</link>
	    <guid isPermaLink="false">3f882a4bb95c43e27924205306955021</guid>
	    <category>Construction</category>
      <description><![CDATA[Atlas Ward Polska has started work on two logistics parks with a total area of over 70,000 sqm on the eastern outskirts of Szczecin for Panattoni.]]></description>
      <pubDate>Fri, 20 May 2022 0:00:00 T</pubDate> 
    </item>
        <item>
      <title><![CDATA[Rex-Bud to build MDC2 Park Gliwice]]></title>
      <link>https://eurobuildcee.com/en/news/32447-rex-bud-to-build-mdc2-park-gliwice</link>
	    <guid isPermaLink="false">ef1b9b0b9c5ad1de09b779f4f97ca59b</guid>
	    <category>Construction</category>
      <description><![CDATA[Polish industrial developer MDC2 has chosen Rex-Bud Budownictwo to be the general contractor for MDC2 Park Gliwice in Upper Silesia.]]></description>
      <pubDate>Wed, 11 May 2022 0:00:00 T</pubDate> 
    </item>
        <item>
      <title><![CDATA[FineTech chosen to complete Lixa]]></title>
      <link>https://eurobuildcee.com/en/news/32413-finetech-chosen-to-complete-lixa</link>
	    <guid isPermaLink="false">ea991922e5d2d407b59be72152863092</guid>
	    <category>Construction</category>
      <description><![CDATA[Yareal has commissioned FineTech Construction to be the general contractor responsible for completing the final stages of its Lixa office complex in Warsaw.]]></description>
      <pubDate>Fri, 29 Apr 2022 0:00:00 T</pubDate> 
    </item>
        <item>
      <title><![CDATA[Prices rise for construction]]></title>
      <link>https://eurobuildcee.com/en/news/32409-prices-rise-for-construction</link>
	    <guid isPermaLink="false">929ba3c615223cf7248590ae175fcce7</guid>
	    <category>Construction</category>
      <description><![CDATA[Prices for building materials in Poland increased by close to 30 pct over the last twelve months according to Savills. ]]></description>
      <pubDate>Thu, 28 Apr 2022 0:00:00 T</pubDate> 
    </item>
        <item>
      <title><![CDATA[Erbud to rebuild Gdańsk shipping infrastructure]]></title>
      <link>https://eurobuildcee.com/en/news/32293-erbud-to-rebuild-gdansk-shipping-infrastructure</link>
	    <guid isPermaLink="false">ae482b6bae6b28e5f1631932d6e5c382</guid>
	    <category>Construction</category>
      <description><![CDATA[Erbud is to reconstruct the Nabrzeże Szyprów shore in Gdańsk for PLN 28.5 mln. ]]></description>
      <pubDate>Mon, 21 Mar 2022 0:00:00 T</pubDate> 
    </item>
        <item>
      <title><![CDATA[Hochtief builds for Warsaw University]]></title>
      <link>https://eurobuildcee.com/en/news/32205-hochtief-builds-for-warsaw-university</link>
	    <guid isPermaLink="false">df2782c019d0d66a88af774011e8ab29</guid>
	    <category>Construction</category>
      <description><![CDATA[Hochtief Polska has completed construction work on an educational building for the University of Warsaw on ul. Dobra for the department of applied linguistics.]]></description>
      <pubDate>Fri, 25 Feb 2022 0:00:00 T</pubDate> 
    </item>
        <item>
      <title><![CDATA[Financing secured for completion of The Park Kraków ]]></title>
      <link>https://eurobuildcee.com/en/news/32104-financing-secured-for-completion-of-the-park-krakow</link>
	    <guid isPermaLink="false">8f1922a57790242d2297a922019048ec</guid>
	    <category>Construction</category>
      <description><![CDATA[International investor Cain International and its local development partner, White Star Real Estate, have secured a EUR 36 mln loan from PKO BP to complete the development of The Park Kraków.]]></description>
      <pubDate>Fri, 28 Jan 2022 0:00:00 T</pubDate> 
    </item>
        <item>
      <title><![CDATA[Erbud takes in GWI for wooden mod cons]]></title>
      <link>https://eurobuildcee.com/en/news/32088-erbud-takes-in-gwi-for-wooden-mod-cons</link>
	    <guid isPermaLink="false">aa773e29eef2a5c30b84d36435f99094</guid>
	    <category>Construction</category>
      <description><![CDATA[Polish construction firm Erbud has merged its subsidiary Mod21 with German wooden modular buildings specialist GWI to establish a new company, also called Mod21.]]></description>
      <pubDate>Wed, 26 Jan 2022 0:00:00 T</pubDate> 
    </item>
        <item>
      <title><![CDATA[Erbud wins PLN 300 mln Lidl contract]]></title>
      <link>https://eurobuildcee.com/en/news/32009-erbud-wins-pln-300-mln-lidl-contract</link>
	    <guid isPermaLink="false">44c7d2e7b23eee739f61b49c659a25f5</guid>
	    <category>Construction</category>
      <description><![CDATA[Erbud has been awarded a PLN 298.4 mln contract to build a distribution centre for discount retailer Lidl near Błonie, west of Warsaw.]]></description>
      <pubDate>Fri, 31 Dec 2021 0:00:00 T</pubDate> 
    </item>
        <item>
      <title><![CDATA[Erbud to build three residential blocks in Warsaw]]></title>
      <link>https://eurobuildcee.com/en/news/31917-erbud-to-build-three-residential-blocks-in-warsaw</link>
	    <guid isPermaLink="false">097bf611b4bd8f82ad46290f9478a666</guid>
	    <category>Construction</category>
      <description><![CDATA[Erbud has announced a PLN 52.8 mln contract with Polish Export Trade & Investment to build three residential buildings in Warsaw’s Praga-Południe district. ]]></description>
      <pubDate>Thu, 02 Dec 2021 0:00:00 T</pubDate> 
    </item>
        <item>
      <title><![CDATA[Skanska partners with Holcim]]></title>
      <link>https://eurobuildcee.com/en/news/31839-skanska-partners-with-holcim</link>
	    <guid isPermaLink="false">05a6cd7ec4ebca7b256ee86cefd9c488</guid>
	    <category>Construction</category>
      <description><![CDATA[Skanska has announced a strategic partnership with concrete supplier Holcim Romania to help it reach carbon neutrality by 2045. ]]></description>
      <pubDate>Wed, 10 Nov 2021 0:00:00 T</pubDate> 
    </item>
        <item>
      <title><![CDATA[Warsaw psychology faculty takes shape]]></title>
      <link>https://eurobuildcee.com/en/news/31829-warsaw-psychology-faculty-takes-shape</link>
	    <guid isPermaLink="false">f1a83118e2c5697f6679b2ce354e7f8d</guid>
	    <category>Construction</category>
      <description><![CDATA[Work is progressing on Mostostal Warszawa’s construction of a new building for the Faculty of Psychology of the University of Warsaw, having now reached the foundation slab stage.]]></description>
      <pubDate>Tue, 09 Nov 2021 0:00:00 T</pubDate> 
    </item>
        <item>
      <title><![CDATA[Food science centre for SGGW]]></title>
      <link>https://eurobuildcee.com/en/news/31433-food-science-centre-for-sggw</link>
	    <guid isPermaLink="false">757be053baa902a28fef53520783d4c0</guid>
	    <category>Construction</category>
      <description><![CDATA[Skanska is to build the Innovation Centre for Food Sciences for the Warsaw University of Life Sciences [SGGW]. ]]></description>
      <pubDate>Wed, 30 Jun 2021 0:00:00 T</pubDate> 
    </item>
        <item>
      <title><![CDATA[Mostostal Warszawa and Acciona Construcción to build Opatów bypass]]></title>
      <link>https://eurobuildcee.com/en/news/31410-mostostal-warszawa-and-acciona-construccion-to-build-opatow-bypass</link>
	    <guid isPermaLink="false">5994cf5ebd61f4806932d5f226cb64d0</guid>
	    <category>Construction</category>
      <description><![CDATA[A consortium of Mostostal Warszawa and Acciona Construcción has signed a contract for the design and construction of a bypass around Opatów along the S74 expressway and national road.]]></description>
      <pubDate>Wed, 23 Jun 2021 0:00:00 T</pubDate> 
    </item>
        <item>
      <title><![CDATA[Skanska wins PLN 141 mln contract for Beiersdorf Poznań plant]]></title>
      <link>https://eurobuildcee.com/en/news/31263-skanska-wins-pln-141-mln-contract-for-beiersdorf-poznan-plant</link>
	    <guid isPermaLink="false">b884881fa38175c803d9084ac18e39b9</guid>
	    <category>Construction</category>
      <description><![CDATA[Skanska has been awarded a PLN 141 mln contract by Beiersdorf Manufacturing Poznań to expand and reconstruct a production facility in Poznań, Poland. The contract be included in Skanska’s order bookings for Europe for H2 2021.]]></description>
      <pubDate>Wed, 19 May 2021 0:00:00 T</pubDate> 
    </item>
        <item>
      <title><![CDATA[Skysawa tunnel complete]]></title>
      <link>https://eurobuildcee.com/en/news/31115-skysawa-tunnel-complete</link>
	    <guid isPermaLink="false">c872b22bc2ece6de7deafc6b5982b960</guid>
	    <category>Construction</category>
      <description><![CDATA[General contractor Porr has completed the construction work on the tunnel connecting the Skysawa mixed-use complex in Warsaw and the Rondo ONZ metro station.]]></description>
      <pubDate>Thu, 15 Apr 2021 0:00:00 T</pubDate> 
    </item>
      </channel>
</rss>
