With a visit at Plac Zamkowy - Business with Heritage
schedule 08 July 2015

1 / 104

2 / 104

3 / 104

4 / 104

5 / 104

6 / 104

7 / 104

8 / 104

9 / 104

10 / 104

11 / 104

12 / 104

13 / 104

14 / 104

15 / 104

16 / 104

17 / 104

18 / 104

19 / 104

20 / 104

21 / 104

22 / 104

23 / 104

24 / 104

25 / 104

26 / 104

27 / 104

28 / 104

29 / 104

30 / 104

31 / 104

32 / 104

33 / 104

34 / 104

35 / 104

36 / 104

37 / 104

38 / 104

39 / 104

40 / 104

41 / 104

42 / 104

43 / 104

44 / 104

45 / 104

46 / 104

47 / 104

48 / 104

49 / 104

50 / 104

51 / 104

52 / 104

53 / 104

54 / 104

55 / 104

56 / 104

57 / 104

58 / 104

59 / 104

60 / 104

61 / 104

62 / 104

63 / 104

64 / 104

65 / 104

66 / 104

67 / 104

68 / 104

69 / 104

70 / 104

71 / 104

72 / 104

73 / 104

74 / 104

75 / 104

76 / 104

77 / 104

78 / 104

79 / 104

80 / 104

81 / 104

82 / 104

83 / 104

84 / 104

85 / 104

86 / 104

87 / 104

88 / 104

89 / 104

90 / 104

91 / 104

92 / 104

93 / 104

94 / 104

95 / 104

96 / 104

97 / 104

98 / 104

99 / 104

100 / 104

101 / 104

102 / 104

103 / 104

104 / 104








































































































Currently, the finishing work is being carried out in the building, which is set to be completed in the summer of 2015. The construction work on Senatorska Investment’s Plac Zamkowy – Business with Heritage office building is nearing completion. The project’s close surroundings: the city’s pavement and street which were renovated by the investor, are now almost ready to use. Also, the new building’s façade is nearly completed. The façade of the Podwale 1 tenement house building, which is part of the project, is still unfinished. The old building was partly deconstructed in the process in order to get internally linked to the new office building. However, the investor is still to connect the two structures. Meanwhile, the work on the U-shaped project’s open courtyard is being carried out. This side of Plac Zamkowy – Business with Heritage will be facing the Branicki Palace. Now the constructors lay paving stone in front of the entrances to the building. All installations inside the building have been completed and they are currently being inspected. Also, the building’s electrical system is set to be connected to its lighting system soon. Marble floors and glass railing are being installed in the stairways.
Plac Zamkowy – Business with Heritage is a four-storey 5,700 sqm gla office and services building with 1,600 sqm of services and retail space facing the Castle Square (located on both the ground and first floors) and 3,900 sqm of office space split across upper floors. Also, a two-storey underground car park with 27 spaces will be provided. Tenants will also be able to use 30 bicycle parking spaces. The project’s architectural design is the work of Wojciech Grabianowski from the RKW Rhode Kellermann Wawrowski architectural studio. Its investor is Senatorska Investment and the general contractor is NDI.