It will comprise a 32,000 sqm manufacturing section and 2,000 sqm of office and social space. Epoxy flooring will be installed, while the factory will be lit by 12.5 pct of natural light through skylights across the entire area of the roof. With an anticipated workforce of 90 people in the first phase and eventually 400 people by 2020, the building will have a car park for 300 vehicles and has been designed so that it could be expanded by almost 30,000 sqm. The opening of the plant is scheduled for early January 2017. “The possibility of future expansion options for the project was among the key factors, which not only determined the choice of a flexible building design but also the choice of location by the investor. Other determining factors included the motorway access and the availability of a qualified workforce. With Panattoni Europe’s experience from similar projects, the preparation phase has proceeded with great efficiency, and so the execution of the entire projec